Date of Inspection
|
Inspection Type
|
Inspector
|
Result
|
|
Notes
|
|
12/05/2022 | STRUCTURAL CONCRETE | VCA3 | PARTIAL | 27214 | 12/5/2022 11:12:46 AM
Deck required for type of bond beam steel installed
|
|
01/25/2023 | POOL SPA ENCLOSURE | VCA3 | CORRECTIONS | 594213 | 1/25/2023 11:42:45 AM
Not ready
|
|
01/25/2023 | GAS TEST | VCA3 | PASS | | |
|
01/30/2023 | POOL SPA ENCLOSURE | Murray Armstrong | CORRECTIONS | 444708 | 1/30/2023 9:54:11 AM
A gate has not yet been installed, and interior door lumps are missing
|
|
03/01/2023 | POOL SPA ENCLOSURE | VCA3 | PASS | 13121 | |
|
04/04/2023 | FINAL BUILDING** | Phil Brandenburg | PASS | 1109 | |
|
|
|
|