| INTERIOR DRYWALL | Murray Armstrong | PARTIAL | 34105 | 1/30/2023 10:47:23 AM
Separating units, one side only
|
|
| STEEL FRAMING | VCA3 | CORRECTIONS | 244313 | 5/17/2023 1:08:46 PM
Provide approved, stamped set of plans
|
|
| GROUT LIFT | VCA3 | CORRECTIONS | 175611 | 5/17/2023 1:08:56 PM
Provide approved, stamped set of plans
|
|
| STEEL FRAMING | VCA3 | PASS | 38621 | 5/22/2023 7:15:13 AM
Picked up SOR, deputy welding and bolting report and mill certs
|
|
| SHEARWALL | VCA3 | CORRECTIONS | 19231 | 5/22/2023 1:16:18 PM
Third floor previous correction of shots not done
|
|
| STEEL FRAMING | INSPECTOR BUCKET | | 281505 | |
|
07/03/2023 | ROUGH FRAMING | VCA3 | CORRECTIONS | | 7/3/2023 2:42:28 PM
Add 45b0 braces in soffits or detail showing not required
Box beam type to be called out on framing plan
|
|
07/05/2023 | STEEL FRAMING | VCA3 | CORRECTIONS | | 7/5/2023 7:04:38 AM
Install 45 alternating bracing in soffits or details showing not required
|
|
07/11/2023 | ROUGH FRAMING | Murray Armstrong | PARTIAL | | 7/11/2023 9:38:37 AM
Provide documentation for struct steel. Ok to one side drywall at metal framing on third floor
|
|
07/11/2023 | BONDING WATER GAS | Murray Armstrong | PARTIAL | | 7/11/2023 9:38:32 AM
marm changed Inspection Type from STEEL FRAMING to BONDING WATER GAS
7/11/2023 9:39:36 AM
Not required
|
|
07/24/2023 | FOOTINGS FOUNDATION | VCA3 | CORRECTIONS | 44336 | 7/24/2023 12:32:05 PM
Complete cleaning of footings
What is size and reinforcement of footings under columns
|
|
11/21/2023 | ROUGH FRAMING | Murray Armstrong | PARTIAL | 263318 | 11/21/2023 10:23:41 AM
Pending detail for boxed headers
|
|
01/22/2024 | INSULATION | Murray Armstrong | PASS | 282507 | |
|
01/24/2024 | INSULATION | Murray Armstrong | PASS | 295108 | 1/24/2024 6:41:20 AM
Previously approved
|
|
01/30/2024 | INTERIOR DRYWALL | Phil Brandenburg | CORRECTIONS | | 1/30/2024 8:34:38 AM
Contractor stated inspection was set up for a different day and not ready
|
|