Date of Inspection
|
Inspection Type
|
Inspector
|
Result
|
|
Notes
|
|
02/14/2024 | FOOTINGS FOUNDATION | Murray Armstrong | PASS | 34812 | 2/14/2024 12:24:26 PM
At trash enclosure
|
|
03/06/2024 | FOOTINGS FOUNDATION | Phil Brandenburg | PARTIAL | 234921 | 3/6/2024 9:37:55 AM
Approved slab on grade 4 proposed trash enclosure
|
|
03/06/2024 | STRUCTURAL CONCRETE | Phil Brandenburg | PARTIAL | 23903 | 3/6/2024 9:37:57 AM
Approved slab on grade 4 proposed trash enclosure
|
|
03/07/2024 | FOOTINGS/FOUNDATION | Phil Brandenburg | PARTIAL | | 3/7/2024 6:28:58 AM
trash enclosure approved w structural observations
|
|
03/14/2024 | GROUT LIFT | Phil Brandenburg | PARTIAL | 193517 | 3/14/2024 9:25:13 AM
First 4 feet also approved temporary power pole
|
|
03/19/2024 | GROUT LIFT | Phil Brandenburg | PARTIAL | 162904 | 3/19/2024 8:34:32 AM
Second left approved
|
|
03/27/2024 | FOOTINGS FOUNDATION | Phil Brandenburg | CORRECTIONS | 235523 | 3/27/2024 9:44:08 AM
Provide minimum 24 inch embedment at footings for ware storage
|
|
03/29/2024 | FOOTINGS/FOUNDATION | Phil Brandenburg | PASS | | 3/28/2024 6:42:20 AM
ware storage and existing structure
|
|
04/04/2024 | SHEARWALL | Phil Brandenburg | PASS | 332813 | |
|
04/04/2024 | ROUGH FRAMING | Phil Brandenburg | PASS | 34714 | |
|
04/05/2024 | ROOF SHEATHING | Phil Brandenburg | PASS | 455821 | 4/5/2024 9:46:23 AM
Also approved underground electrical
|
|
04/12/2024 | EXTERIOR LATH | Phil Brandenburg | PASS | 33704 | |
|
04/19/2024 | STRUCTURAL CONCRETE | Phil Brandenburg | PASS | | 4/15/2024 7:02:12 AM
slab on grade
|
|
04/22/2024 | FOOTINGS/FOUNDATION | Phil Brandenburg | PASS | | 4/15/2024 7:03:05 AM
North dining area
|
|
| ROUGH FRAMING | INSPECTOR BUCKET | | 202718 | |
|
04/24/2024 | ROUGH FRAMING | Murray Armstrong | PASS | 41421 | 4/24/2024 9:37:34 AM
Framing at North building, storage kitchen.
|
|
04/25/2024 | FOOTINGS FOUNDATION | Phil Brandenburg | CORRECTIONS | 524115 | 4/25/2024 8:42:34 AM
Need approved drawings
|
|
| FOOTINGS FOUNDATION | INSPECTOR BUCKET | | 212023 | |
|
| STRUCTURAL CONCRETE | INSPECTOR BUCKET | | 22624 | |
|
04/26/2024 | FOOTINGS/FOUNDATION | Phil Brandenburg | PASS | | 4/26/2024 6:41:06 AM
revision areas
|
|
04/30/2024 | EXTERIOR LATH | Phil Brandenburg | CORRECTIONS | 102605 | 4/30/2024 10:08:05 AM
Not ready small areas. Still need flashing.
|
|
05/07/2024 | STRUCTURAL CONCRETE | Phil Brandenburg | PASS | 311626 | 5/7/2024 7:55:44 AM
Remaining slab on grade
|
|
05/15/2024 | INSULATION | Phil Brandenburg | PASS | 05637 | |
|
| INSULATION | Murray Armstrong | | 244130 | |
|
05/17/2024 | ROOF SHEATHING | Murray Armstrong | PASS | 64106 | 5/17/2024 9:05:18 AM
At public dining room, and attached restrooms
5/17/2024 9:06:10 AM
At public dining room, and attached restrooms
5/17/2024 9:06:55 AM
At public dining room, and attached restrooms
5/17/2024 9:23:26 AM
At public dining room, and attached restrooms
5/17/2024 9:31:26 AM
At public dining room, and attached restrooms
5/17/2024 9:52:19 AM
At public dining room, and attached restrooms
5/17/2024 10:39:39 AM
At public dining room, and attached restrooms
5/17/2024 11:47:09 AM
At public dining room, and attached restrooms
5/18/2024 4:07:42 AM
At public dining room, and attached restrooms
|
|
05/17/2024 | INTERIOR WALL FRAMG | Murray Armstrong | PASS | 375216 | 5/17/2024 9:05:20 AM
At public dining room, and attached restrooms. Have also given approval to install mop sink in rear building, approve drywall at same.
5/17/2024 9:06:12 AM
At public dining room, and attached restrooms. Have also given approval to install mop sink in rear building, approve drywall at same.
5/17/2024 9:06:57 AM
At public dining room, and attached restrooms. Have also given approval to install mop sink in rear building, approve drywall at same.
5/17/2024 9:23:28 AM
At public dining room, and attached restrooms. Have also given approval to install mop sink in rear building, approve drywall at same.
5/17/2024 9:31:29 AM
At public dining room, and attached restrooms. Have also given approval to install mop sink in rear building, approve drywall at same.
5/17/2024 9:52:23 AM
At public dining room, and attached restrooms. Have also given approval to install mop sink in rear building, approve drywall at same.
5/17/2024 10:39:41 AM
At public dining room, and attached restrooms. Have also given approval to install mop sink in rear building, approve drywall at same.
5/17/2024 11:47:12 AM
At public dining room, and attached restrooms. Have also given approval to install mop sink in rear building, approve drywall at same.
5/18/2024 4:07:45 AM
At public dining room, and attached restrooms. Have also given approval to install mop sink in rear building, approve drywall at same.
|
|
05/17/2024 | ROUGH FRAMING | Murray Armstrong | PASS | 37515 | 5/17/2024 9:05:23 AM
At public dining room, and attached restrooms. Have also given approval to install mop sink in rear building, approve drywall at same.
5/17/2024 9:06:14 AM
At public dining room, and attached restrooms. Have also given approval to install mop sink in rear building, approve drywall at same.
5/17/2024 9:06:59 AM
At public dining room, and attached restrooms. Have also given approval to install mop sink in rear building, approve drywall at same.
5/17/2024 9:23:31 AM
At public dining room, and attached restrooms. Have also given approval to install mop sink in rear building, approve drywall at same.
5/17/2024 9:31:31 AM
At public dining room, and attached restrooms. Have also given approval to install mop sink in rear building, approve drywall at same.
5/17/2024 9:52:25 AM
At public dining room, and attached restrooms. Have also given approval to install mop sink in rear building, approve drywall at same.
5/17/2024 10:39:51 AM
At public dining room, and attached restrooms. Have also given approval to install mop sink in rear building, approve drywall at same.
5/17/2024 11:47:14 AM
At public dining room, and attached restrooms. Have also given approval to install mop sink in rear building, approve drywall at same.
5/18/2024 4:07:47 AM
At public dining room, and attached restrooms. Have also given approval to install mop sink in rear building, approve drywall at same.
|
|
|
|
|