03/14/2022 | FINAL ELECTRICAL** | Phil Brandenburg | CORRECTIONS | 355615 | 3/14/2022 9:47:42 AM
Contractor not on site for inspection
|
|
03/21/2022 | FINAL ELECTRICAL** | JAS1 | CORRECTIONS | 354806 | 3/21/2022 6:59:26 AM
Not final, rough
|
|
07/12/2022 | FINAL ELECTRICAL** | JAS1 | CORRECTIONS | 53603 | 7/12/2022 10:32:36 AM
Complete new panel for front
Eliminate all exposed wiring
|
|
07/29/2022 | FINAL ELECTRICAL** | JAS1 | CORRECTIONS | 32008 | 7/29/2022 9:51:55 AM
Finish all work
|
|
01/31/2023 | FINAL ELECTRICAL** | Murray Armstrong | CORRECTIONS | 551903 | 1/31/2023 8:03:44 AM
Front unit
1) nonmetallic cable under island sink not prohibited, remove and replace.
2) Exhaust hood shall have a plug and an outlet or be hardwired.
3) Exhaust hood shall be ducted up through roof.
Attic
1) Secure all loose cabling and line sets.
2) Remove and or terminate all open electrical wiring.
Rear unit
1) Finish installation of light switch at entry.
2) Cover HVAC registers.
3) Energize unit for next inspection.
4) Provide light switch at rear of unit from exterior.
|
|
02/21/2023 | FINAL ELECTRICAL** | VCA3 | CORRECTIONS | 363123 | 2/21/2023 11:32:49 AM
Close exterior wall at light switch to front door of back unit
|
|
03/02/2023 | FINAL ELECTRICAL** | VCA3 | PASS | | |
|