Date of Inspection
|
Inspection Type
|
Inspector
|
Result
|
|
Notes
|
|
| ROUGH ELECTRICAL | INSPECTOR BUCKET | | | |
|
| FINAL ELECTRICAL | | | | |
|
04/24/2024 | FINAL ELECTRICAL** | Murray Armstrong | PARTIAL | 54414 | 4/24/2024 10:16:29 AM
Not 100% at this time I did a walk-through with the contractor. While on site, I approved his sump pit discharge line. We also discussed covering exposed ABS, and making a step over the connection to the pump.
|
|
04/25/2024 | FINAL ELECTRICAL** | Phil Brandenburg | CORRECTIONS | | 4/25/2024 8:42:36 AM
Need power prior to final
|
|
|
|
|